X
    Categories: News

Iranian Gas Delivery Via Iran-Armenia Pipeline To Start December 20

IRANIAN GAS DELIVERY VIA IRAN-ARMENIA PIPELINE TO START DECEMBER 20

PanARMENIAN.Net
25.10.2006 18:38 GMT+04:00

/PanARMENIAN.Net/ Iranian gas will be received in Armenia via the
Iran-Armenia gas pipeline earlier than planned, stated Director
of High-Voltage Electric Grids – the customer, which has ordered
the building of the Armenian part of the gas pipeline – Sahak
Abrahamyan. In his words, the gas pipeline is expected to be
commissioned December 20 this year instead of January 1, 2007. Sahak
Abrahamyan also reported that the building works on the 38-kilometer
part of the 40-km lot of Meghri-Kajaran are over. The estimated cost
of the building of the 40-km lot is $35 million.

80% of this sum are lent by the Iranian Development Bank to the
Armenian party, while the rest will be allocated from own sources,
reports IA Regnum.

From: Emil Lazarian | Ararat NewsPress

Emil Lazarian: “I should like to see any power of the world destroy this race, this small tribe of unimportant people, whose wars have all been fought and lost, whose structures have crumbled, literature is unread, music is unheard, and prayers are no more answered. Go ahead, destroy Armenia . See if you can do it. Send them into the desert without bread or water. Burn their homes and churches. Then see if they will not laugh, sing and pray again. For when two of them meet anywhere in the world, see if they will not create a New Armenia.” - WS
Related Post