GAS PIPELINE TO REACH AKHALKALAKI
ARMENPRESS
Oct 25, 2007
AKHALKALAKI, OCTOBER 25, ARMENPRESS: The Georgian Oil and Gas
Corporation has announced an international tender for construction
and repair of a gas pipeline stretch from Karmir Shuka to Tsalka
and Alastan.
The pipeline’s diameter will be 300 millimeter.
A-Info news agency operating in Georgia’s Armenian-populated regions,
said the pipeline will be brought to Akhalkalaki, the center of the
Javakheti region.
It said the construction is supposed to be over in 2007 December. It
will be financed by the Oil and Gas Corporation. The stretch is about
7 km long, it said.