X
    Categories: News

ARG To Install Gas Purification Systems

ARG TO INSTALL GAS PURIFICATION SYSTEMS

ARMENPRESS
Dec 14, 2007

YEREVAN, DECEMBER 14, ARMENPRESS: The chief engineer of the
Russian-Armenian ArmRosGazrom (ARG) joint venture, Ashot Hovsepian,
told Armenpress that the company will begin assembling a natural gas
purification station on the border with Georgia next spring.

He said the quality of Russian gas that is shipped across Georgia
to Armenia is not high, which results in clogging of the pipes,
reduction of their capacity and disruption of the measurement system,
which eventually affect consumers.

He said the project is estimated at $ 3 million.

The installation of the system is supposed to be over in 2008 autumn.

He also said purification systems will be installed at all gas
distribution stations which would drastically improve the quality of
gas supplies.

From: Emil Lazarian | Ararat NewsPress

Emil Lazarian: “I should like to see any power of the world destroy this race, this small tribe of unimportant people, whose wars have all been fought and lost, whose structures have crumbled, literature is unread, music is unheard, and prayers are no more answered. Go ahead, destroy Armenia . See if you can do it. Send them into the desert without bread or water. Burn their homes and churches. Then see if they will not laugh, sing and pray again. For when two of them meet anywhere in the world, see if they will not create a New Armenia.” - WS
Related Post