GAS SUPPLY RESTORED
Hayots Ashkhar Daily
30 Sep 2008
Armenia
To provide the high level of "carrying capacity" of North Caucasus-
Trans-Caucasus gas pipeline, 500 millimeters in diameter pipeline
has been replaced by the one with 1000 millimeter in diameter.
The works have been implemented by the financial means allocated
by "ArmRusGasIndustry" CSC and Georgian specialized construction
organizations. During the realization of the works the gas allocated to
Armenia was temporarily stopped and the whole gas supply was provided
by Abovyan underground gas-store station.
"ArmRusGasIndustry" CSC informs there will be no limitation in the
supply market. The construction work was to finish yesterday evening
and the gas supply will be completely restored.