X
    Categories: News

‘South Caucasus Railway’ Has No Authorities To Participate In Iran-A

‘SOUTH CAUCASUS RAILWAY’ HAS NO AUTHORITIES TO PARTICIPATE IN IRAN-ARMENIA RAILWAY CONSTRUCTION: SCRW DIRECTOR

ArmInfo
2009-02-25 14:51:00

‘South Caucasus Railway’ has no authorities to participate in
Iran-Armenia railway construction: SCRW Director

ArmInfo. The ‘South Caucasus Railway’ has not yet authorities for
participation in Iran-Armenia railway construction, SCRW Director
General Shevket Shaydullin told journalists today.

‘Creation of the railway transit corridors is of great importance
for the Armenian economy in general. It is important for us as well
as it means an opportunity of increasing the freight traffic volume
and profit earning. As for participation of South Caucasus Rail Way
[SCRW] in this project, we have currently no relevant authorities in
the investment project. However, this issue was discussed at the level
of the Armenian and Russian governments and got a positive assessment.

First of all, here the main problem is the rate of return and the
staff of participants. I think this issue will be shortly clarified’,
S. Shaydullin said.

To note, according to specialists, construction of Iran-Armenia
railway will take not less than 5 years. By preliminary calculations,
the project may cost $1,5-2 bln.

From: Emil Lazarian | Ararat NewsPress

Emil Lazarian: “I should like to see any power of the world destroy this race, this small tribe of unimportant people, whose wars have all been fought and lost, whose structures have crumbled, literature is unread, music is unheard, and prayers are no more answered. Go ahead, destroy Armenia . See if you can do it. Send them into the desert without bread or water. Burn their homes and churches. Then see if they will not laugh, sing and pray again. For when two of them meet anywhere in the world, see if they will not create a New Armenia.” - WS
Related Post